Subcritical pressure high-temperature steam power plant and subcritical pressure high-temperature variable pressure operation once-through boiler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9784137
SERIAL NO

14019802

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A subcritical pressure high-temperature steam power plant includes a combustion boiler system, steam turbine generator system, and condensate and feedwater system and wherein the conditions of steam generated in the boiler system and supplied to the steam turbine generator system are subcritical pressure and high temperature (turbine inlet temperature of 593° C. or more).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koizumi, Jun Tokyo, JP 23 659
Noguchi, Yoshiki Tokyo, JP 27 528
Saito, Kazuhiko Tokyo, JP 38 517
Sasaki, Toshihiko Tokyo, JP 32 497
Shinotsuka, Noboru Tokyo, JP 1 2
Yoshida, Yuichi Tokyo, JP 151 1784

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00