Gas compression system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9784075
APP PUB NO 20150322749A1
SERIAL NO

14695836

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined multi-phase pump and compressor unit and a gas compression system are provided. The combined multi-phase pump and compressor unit functions on a centrifugal principle for transporting liquid and gas from a flow conditioner to a remote multi-phase receiving plant, wherein a rotating separator separates liquid and gas upstream of a compressor part of the combined multi-phase pump and compressor unit, wherein the separated liquid is collected in a rotating annulus in such a way that the liquid is given kinetic energy which is converted to pressure energy in a static system, and wherein the pressurized liquid bypasses the compressor part of the combined multi-phase pump and compressor unit, and then is re-mixed with the gas downstream of the combined multi-phase pump and compressor unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STATOIL PETROLEUM ASSTAVANGER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bakke, William Røyken, NO 8 53
Bjørge, Tor Hundhamaren, NO 7 27
Brenne, Lars Sandnes, NO 18 52
Egerdahl, Bjorn-André N-Røyneberg, NO 3 11
Ramberg, Rune Mode Sandnes, NO 4 57
Underbakke, Harald Sandnes, NO 11 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00