Catalytic biomass conversion methods, catalysts, and methods of making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9783474
SERIAL NO

15032218

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein are processes for one-step delignification and hydrodeoxygenation of lignin fraction a biomass feedstock. The lignin feedstock is derived from by-products of paper production and biorefineries. Additionally described is a process for converting biomass-derived oxygenates to lower oxygen-content compounds and/or hydrocarbons in the liquid or vapor phase in a reactor system containing hydrogen and a catalyst comprised of a hydrogenation function and/or an oxophilic function and/or an acid function. Finally, also described herein is a process for converting biomass-derived oxygenates to lower oxygen-content compounds and/or hydrocarbons in the liquid or vapor phase in a reactor system containing hydrogen and a catalyst comprised of a hydrogenation function and/or an oxophilic function and/or an acid function.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PURDUE RESEARCH FOUNDATION101 FOUNDRY DRIVE SUITE 2500 WEST LAFAYETTE IN 47906

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abu-Omar, Mahdi M West Lafayette, US 10 9
Agrawal, Rakesh West Lafayette, US 265 9553
Delgass, William Nicholas West Lafayette, US 2 10
Dietrich, Paul James Naperville, US 1 3
Klein, Ian Michael Lafayette, US 16 78
Parsell, Trenton Lafayette, US 2 3
Ribeiro, Fabio Henrique West Lafayette, US 3 8
Saha, Basudeb West Lafayette, US 12 26
Yohe, Sara Lynn West Lafayette, US 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00