Methods of producing hydrogen and solid carbon

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9783416
SERIAL NO

14775946

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing hydrogen, includes heating a process feed gas stream, flowing the process feed gas stream into a first reaction zone, flowing the intermediate gas stream into a second reaction zone, removing the solid carbon product from the second reaction zone, removing the tail gas stream from the second reaction zone, and removing hydrogen from the tail gas stream. The process gas stream includes methane and steam. The first reaction zone contains a first catalyst, and at least a portion of the process feed gas stream is converted into an intermediate gas stream in the first reaction zone. The second reaction zone contains a second catalyst, and at least a portion of the intermediate gas stream is converted into a tail gas stream and a solid carbon product in the second reaction zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEERSTONE LLC808 EAST 1910 SOUTH SUITE 2 PROVO UT 84606

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noyes, Dallas B Provo, US 49 1104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00