Charge transfer system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9783070
SERIAL NO

14562399

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charge transfer system includes an on-board vehicle motor system and a plug in supply. The on-board vehicle motor system includes a first motor including a plurality of stator windings, a second motor including a plurality of stator windings, a first inverter having a plurality of switch legs, a second inverter having a plurality of switch legs, a controller, and an on-board power supply. The plug-in supply is connected between at least one switch leg of the first inverter and at least one switch leg of the second inverter. The controller modulates the switch legs of the first and second inverters such that electric current flows through at least one stator winding of the first or second motor to charge the on-board power supply. The current flow can also alternate in phase with plug-in supply polarity to produce a stable stator flux vector angle preventing motor rotation during charge transfer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JABIL INC10560 DR MARTIN LUTHER KING JR STREET N ST PETERSBURG FL 33716

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Danner, Jeffrey David St. Petersburg, US 9 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00