Operator platform for a construction machine and construction machine having an operator platform

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9783056
SERIAL NO

14876300

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an operator platform for a construction machine and to a construction machine, particularly a road construction machine such as a road milling machine or a road paver, with an operator platform. The operator platform comprises an operator platform base, an operating panel and an operator seat, wherein an operating panel mount with a pivoting device is provided, by means of which the operating panel is pivotable about a vertical pivot axis between a first pivoting position and a second pivoting position. The operating panel mount comprises a height adjustment device which is configured such that the operating panel can be locked at different height positions independently of the pivoting positions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOMAG GMBHHELLERWALD BOPPARD 56154

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anheier, Thorsten Kobern-Gondorf, DE 7 21
Klein, Thomas Wehr, DE 229 2424
Kuhn, Stefan Steinbach, DE 14 52
Wilhelm, Nico Boppard, DE 1 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00