Manufacturing method for laminated iron core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9782959
APP PUB NO 20160023447A1
SERIAL NO

14798656

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method for laminated iron cores includes processing a metal sheet to form product sheets, in each of which iron core pieces are arranged inside an outer frame piece and the iron core pieces are connected to the outer frame piece in such a way that outer peripheral sides of the iron core pieces are connected to nearest parts of the outer frame piece through bridge pieces, laminating the product sheets and temporarily fixing the product sheets adjacent to each other in a vertical direction together to form a sheets laminated body including iron core pieces laminated parts and bridge pieces laminated parts, sealing the iron core pieces laminated parts by a resin while being pressurized to form pre-formed laminated iron cores, and separating the bridge pieces laminated parts from the pre-formed laminated iron cores to form the laminated iron cores which are individually separated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUI HIGH-TEC INCFUKUOKA PREFECTURE FUKUOKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shimizu, Koji Fukuoka, JP 159 2248

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00