Method and device for manufacturing composite material parts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9782958
SERIAL NO

14388555

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The manufacturing method object of the invention comprises the following stages: A) stacking strips of prepreg material on a laminating tool (14), so that an angled laminated part (2) is obtained comprising a central section (2a) contained in a first plane (12), at least one side section (2b) contained in a second plane (13), and at least one bending axis (5) between the central section (2a) and the at least one side section (2b), so that, the first plane and the second plane form an angle α; B) forming of the angled laminated part (2) comprising bending along the bending axis (5) the, at least, one side section with respect to the central section (2a), obtaining a formed part (6); C) curing, of the formed part (6).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS OPERATIONS S LAVDA JOHN LENNON S/N GETAFE MADRID 28902

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cano, Cediel David Madrid, ES 2 9
Chinarro, Vera Ruth Madrid, ES 2 7
Escobar, Benavides Francisco Madrid, ES 3 22
Nogueroles, Viñes Pedro Madrid, ES 11 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00