Transmission control apparatus and program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9780852
SERIAL NO

14879104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a transmission control apparatus that determine a first phase difference for a phase difference between an electric wave output by a first antenna and an electric wave output by a second antenna, and for a phase difference between an electric wave output by a third antenna and an electric wave output by a fourth antenna, based on a determined polarization characteristic; determines a second phase difference for a phase difference between the electric wave output by the first antenna and the electric wave output by the third antenna and for a phase difference between the electric wave output by the second antenna and the electric wave output by the fourth antenna, based on the determined beam direction; and controls phases of the electric waves output by the first to fourth antennas, according to the first and second phase differences.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOFTBANK CORPTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanai, Takeo Mission Viejo, US 28 285

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00