Vibration power generator and power generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9780696
APP PUB NO 20150069880A1
SERIAL NO

14391546

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vibration power generator configured to generate power by displacement between an electret group having a plurality of electrets and an electrode group having a plurality of electrodes in a relative movement direction in response to an external vibration, includes a casing in which the electret group and the electrode group are disposed, a fixed member in which one of the electret group and the electrode group is disposed, the fixed member being fixed to a side of the casing, and a movable member in which the other of the electret group and the electrode group is disposed. The movable member is disposed in the casing such that the movable member is relatively movable in response to the external vibration while opposed to the fixed member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OMRON CORPORATION801 MINAMIFUDODO-CHO HORIKAWAHIGASHIIRU SHIOKOJI-DORI SHIMOGYO-KU KYOTO-SHI KYOTO 600-8530

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikuta, Masayo Kyoto, JP 6 20
Masaki, Tatsuakira Nara, JP 10 33
Nabeto, Misato Nara, JP 16 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00