Electrical power converter with a converter cell series unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9780685
SERIAL NO

14412524

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical power converter includes: AC voltage terminals U, V, and W; DC voltage terminals P and N; a converter cell series unit composed of one or more converter cells connected in series between the AC voltage terminals U, V, and W and the DC voltage terminals P and N, each converter cell including a semiconductor element and a capacitor; and a first inductance connected in series to the converter cell series unit, between, of the DC voltage terminals P and N, a DC voltage terminal at the lowest potential with respect to the ground, and the AC voltage terminals U, V, and W.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION;TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Azuma, Satoshi Chiyoda-ku, JP 71 638
Funahashi, Sadao Chuo-ku, JP 10 128
Higashi, Kotaro Chuo-ku, JP 10 105
Hosokawa, Yasuhiko Chuo-ku, JP 31 229
Jimichi, Takushi Chiyoda-ku, JP 46 238
Koyanagi, Kimiyuki Chiyoda-ku, JP 27 219
Tamai, Shinzo Chuo-ku, JP 30 285

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00