Power management utilizing synchronous common coupling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9780682
SERIAL NO

15285401

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to power management apparatuses and systems utilizing synchronous common coupling. A power management apparatus may include a synchronous common coupling, a plurality of ports, and a plurality of electrically isolated stacks connected through the synchronous common coupling. Each electrically isolated stack may include at least one stage, each stage including a source/load bridge, a flux bridge, and a direct current (DC) bus. The source/load bridge may be connected to a source or load through one of the plurality of ports, the flux bridge may be connected to an electrically isolated winding in the synchronous common coupling, and the flux bridge may be connected to the source/load bridge through the DC bus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESILIENT POWER SYSTEMS LLC4500 WILLIAMS DRIVE SYUITE 212-193 GEORGETOWN TX 78633

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Esser, Albert Andreas Maria Austin, US 16 903
Keister, Joshua David Georgetown, US 5 87
Keister, Lyle Thomas Georgetown, US 9 170
Schafer, Bradley John Fayetteville, US 7 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00