Primary voltaic sources including nanofiber Schottky barrier arrays and methods of forming same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9779845
SERIAL NO

13943993

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Primary voltaic sources include nanofiber Schottky barrier arrays and a radioactive source including at least one radioactive element configured to emit radioactive particles. The arrays have a semiconductor component and a metallic component joined at a metal-semiconductor junction. The radioactive source is positioned proximate to the arrays such that at least a portion of the radioactive particles impinge on the arrays to produce a flow of electrons across the metal-semiconductor junction. Methods of producing voltaic sources include reacting at least one carbon oxide and a reducing agent in the presence of a substrate comprising a catalyst to form a solid carbon product over the substrate. Material is disposed over at least a portion of the solid carbon product to form a nanofiber Schottky barrier array. A radioactive source is disposed adjacent the nanofiber Schottky barrier array.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEERSTONE LLC808 EAST 1910 SOUTH SUITE 2 PROVO UT 84606

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noyes, Dallas B Provo, US 49 1104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00