Physical quantity measuring device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9778127
SERIAL NO

14973967

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A differential pressure sensor includes: a sensor module including: a sensor case including a port through which a target fluid is to be introduced and a base attached with the port; a sensor configured to detect a physical quantity of the target fluid; a sensor substrate attached with the sensor, the sensor substrate having an outer circumferential surface facing an inner circumferential surface of the base; and a cover configured to press the sensor substrate against the base; and a case body including an electric circuit that is housed therein and electrically connectable to the sensor module, the case body having an open end to which the sensor module is externally attached, in which a sensor module clearance is defined between the outer circumferential surface of the sensor substrate and an inner circumferential surface of the sensor case.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NAGANO KEIKI CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aruga, Daiki Tokyo, JP 2 3
Ite, Takayuki Tokyo, JP 3 7
Muramatsu, Hideki Tokyo, JP 19 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00