Sprocket assembly and a method for installing a removable tooth on a sprocket frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9777821
APP PUB NO 20160061310A1
SERIAL NO

14938984

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sprocket assembly is provided. The assembly includes a sprocket frame having a central body and a first ledge portion body. The first ledge portion has a first aperture extending therethrough. The assembly further includes a first removable tooth having a first tip portion, first and second landing portions, and a first extension portion. The first tip portion has first and second sides and first and second ends. The first extension portion extends from the second end and has an aperture extending therethrough. The assembly further includes a first bolt extending through the first aperture in the first ledge portion and the aperture in the first extension portion to removably couple the first extension portion to the first ledge portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VAUGHAN INDUSTRIES INCDETROIT MI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balash, Andrew Vaughan Saint Clair Shores, US 8 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00