Exhaust gas heat exchanger

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9777680
SERIAL NO

15275585

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat exchanger that transfers heat from an exhaust gas flow to a liquid coolant includes a first heat exchange section and a second heat exchange section located adjacent the first heat exchange section. The first heat exchange section is located within a first housing that at least partially encloses a first fluid volume. The second heat exchange section is located within a second housing that at least partially encloses a second fluid volume. A first plurality of heat exchange tubes traverses the first heat exchange section, and a second plurality of heat exchange tubes traverses the second heat exchange section. An exhaust gas flow path of the heat exchanger includes the first fluid volume and the interiors of the second plurality of heat exchange tubes. A coolant flow path of the heat exchanger includes the second fluid volume and the interiors of the first plurality of heat exchange tubes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MODINE MANUFACTURING COMPANYRACINE WI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grotophorst, Thomas Muskego, US 9 44
Janke, David Racine, US 2 7
Setty, Viswanath Racine, US 3 7
Wattelet, Jonathan Gurnee, US 8 153

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00