Device and method for multi-path flow from vertical hydraulic tank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9777543
SERIAL NO

14469497

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vertical hydraulic tank includes an upper cylindrical section and a lower conical section, with an outlet in the lower conical section. A lower multi-path manifold is attached to the outlet, the manifold including a vertical conduit in fluid communication with the outlet and a plurality of horizontal conduits in fluid communication with the vertical conduit. An upper multi-path manifold can also be attached to the tank with a plurality of upper horizontal conduits and a vertical conduit in fluid communication with the upper cylindrical section of the tank. Valves may be provided along the vertical conduit and the horizontal conduits to regulate flow of material through the conduits. A pump may be connected to either the upper manifold or the lower manifold, or both by way of a pump conduit. Multiple tanks can be connected together by way of tubing between the manifolds of each tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERTICAL TANK INC1400 NORRIS ROAD BAKERSFIELD CA 93308

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ellis, Stan Bakersfield, US 8 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00