Self-propelling road construction machine, particularly road roller, and method for driving a road construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9777443
SERIAL NO

14601379

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a self-propelling road construction machine, particularly a road roller (1), comprising a travel drive, a steering device, a control device (30) for the travel drive and the steering device, and a driver's seat (5) rotatable by at least 180° and including an integrated operating element (8) for the vehicle speed, with the operating element (8) generating the control signals for the travel drive in dependence on the direction of the control movement of the operating element (8) or the direction of force application on the operating element (8), it is provided that, in response to a first switching command, the control device (30) will automatically perform a reversing process comprising deceleration, seat rotation, change of direction of travel, and acceleration to the set vehicle speed in opposite direction to the original direction of travel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMM AG95643 TIRSCHENREUTH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baumann, Andreas Schwandorf, DE 44 543
Bornemann, Detlef Leonberg, DE 11 82
Mahler, Gerhard Windischeschenbach, DE 9 78
Roemer, Axel Tirschenreuth, DE 12 149

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00