Systems and methods for use in rail track corrections

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9777440
APP PUB NO 20150083013A1
SERIAL NO

14495335

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for use in carrying out rail track corrections. A projector device is positioned on a vehicle deployed ahead of a rail maintenance vehicle and includes a Fresnel lens and a plurality of light emitting diodes arranged to provide a light beam that provides a uniform “spot.” The projector device modulates the light beam in such a manner that a pair of receiver receivers disposed on the rail maintenance vehicle can detect the light source and the light intensity and frequency of wavelength of light received into each receiver of a receiver pair is substantially equal. Recorded values may be used to triangulate the geometry of the section of track being worked, while a computer compares the previous section of track already corrected to the current section and makes calculations for desired corrections to be made at work heads on the rail maintenance vehicle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HARSCO CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carney, Jay R West Columbia, US 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00