Upgrading hydrocarbon pyrolysis products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9777227
SERIAL NO

14683458

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a utility fluid, such as a fluid containing aromatic and non-aromatic ringed molecules, useful as a diluent when hydroprocessing pyrolysis tar, such as steam cracker tar. The specified utility fluid comprises ≧10.0 wt % aromatic and non-aromatic ring compounds and each of the following: (a) ≧1.0 wt % of 1.0 ring class compounds; (b) ≧5.0 wt % of 1.5 ring class compounds; (c) ≧5.0 wt % of 2.0 ring class compounds; and (d) ≦0.1 wt % of 5.0 ring class compounds. The invention also relates to methods for producing such a utility fluid and to processes for hydroprocessing pyrolysis tar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL CHEMICAL PATENTS INC22777 SPRINGWOODS VILLAGE PKWY TECH & IP LAW SPRING TX 77389

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buchanan, John S Flemington, US 49 921
Evans, Christopher M Houston, US 23 225
Ferrughelli, David T Flemington, US 43 573
Martens, Luc R M Meise, BE 54 623
Reed, Keith G Houston, US 6 124
Soultanidis, Nikolaos Houston, US 16 94
Wang, Frank C Annandale, US 38 858
Xu, Teng Houston, US 147 1457
Yung, Cathleen Phillipsburg, US 5 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00