Coating method for surfaces in chemical installations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9777187
APP PUB NO 20170051176A1
SERIAL NO

15039299

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention pertains to a method for providing a metallic or concrete surface of a chemical installation with a coating, which comprises the steps of—providing a coating composition comprising epoxy-functional resin, and amine curing agent for the epoxy-functional resin, wherein the coating composition comprises an organic silicon-containing compound selected from the group of organosilanes and organosiloxanes, with the molar ratio between the silicon atoms of the organic silicon-containing compound and the epoxy-groups in the coating composition being in the range of 0.20-0.75:1.00, —applying the coating composition to a metallic or concrete surface of a chemical installation to form a coating layer, and—allowing the coating layer to cure at a temperature in the range of 0 to 50° C. The invention also pertains to a chemical installation comprising a metallic or concrete surface provided with a lining of a cured coating composition and to a coating composition suitable for providing a metallic or concrete surface of a chemical installation with a coating. It has been found that the coating composition of the present invention shows a wide application spectrum and a high chemical resistance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AKZO NOBEL COATINGS INTERNATIONAL B VARNHEM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cameron, Colin Stocksfield, GB 20 226
Unthank, Matthew George Whitley Bay, GB 6 2
Wright, Anthony Colin Newcastle-upon-tyne, GB 11 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00