Ester production method and ester production device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9776950
APP PUB NO 20170158603A1
SERIAL NO

15323838

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a production device including: a first reactor to form a second gas containing an ester and nitric oxide from a first gas containing carbon monoxide, a nitrite, and nitric oxide; an absorption column to separate the second gas and an absorbing solution into a condensate containing the ester and a noncondensable gas; a second reactor to introduce an alcohol, the noncondensable gas, and oxygen gas thereinto to form a third gas containing nitric oxide and a nitrite; a third reactor to form a fourth gas containing a nitrite from the noncondensable gas and a bottom liquid from the second reactor and to feed the fourth gas to the second reactor; a first measurement unit to measure the concentration of a nitrite in the first gas; and a first flow rate-adjusting unit to adjust the amount of the noncondensable gas to the third reactor based on the concentration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UBE INDUSTRIES, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukui, Yuya Ube, JP 6 0
Il, Hirofumi Ube, JP 5 0
Tanaka, Syuji Ube, JP 7 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00