Chemical vapor deposition process for depositing zinc oxide coatings, method for forming a conductive glass article and the coated glass articles produced thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9776914
APP PUB NO 20150017431A1
SERIAL NO

13261951

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A CVD process for depositing a zinc oxide coating is provided. The CVD process includes providing a moving glass substrate. The CVD process also includes forming a gaseous mixture of an alkyl zinc compound and an inert gas as a first stream, providing a first gaseous inorganic oxygen-containing compound in a second stream and providing a second gaseous inorganic oxygen-containing compound in the second stream, a third stream or in both the second and third streams. Additionally, the CVD process includes mixing the streams at or near a surface of the moving glass substrate and a zinc oxide coating is formed thereon. A method for forming a coated glass article is also provided. Additionally, a coated glass article is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PILKINGTON GROUP LIMITEDLATHOM NR ORMSKIRK LANCASHIRE L40 5UF

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Strickler, David Alan Toledo, US 13 20
Varanasi, Srikanth Ottawa Hills, US 49 223
Wang, Yu Greensboro, US 1481 8143

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00