Method for hydrogen production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9776863
SERIAL NO

14118201

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for hydrogen production and to a method of hydrogen and/or carbon dioxide production from syngas. The method comprises the steps of: (i) providing a gas stream comprising hydrogen and carbon monoxide, (ii) separating at least part of hydrogen from the stream yielding a hydrogen-depleted stream, (iii) subjecting the hydrogen-depleted stream to a water-gas shift reaction, and (iv) separating hydrogen from the stream resulting from step (iii). The method according to the invention improves the conversion of carbon monoxide in the water gas shift reaction and allows to increase the hydrogen production by 10-15% and to increase the overall energy efficiency of the system by 5-7%. The invention further relates to a plant for hydrogen and/or carbon dioxide production suitable for the method of the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STAMICARBON B V ACTING UNDER THE NAME OF MT INNOVATION CENTER6135 KW SITTARD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Antonetti, Elena Rome, IT 8 52
Cucchiella, Barbara Rome, IT 9 40
Iaquaniello, Gaetano Rome, IT 30 159

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00