Drive device for belt conveyor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9776802
SERIAL NO

15117394

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A drive device for a belt conveyor device includes a drive pulley, a first pulley, a second pulley, a support frame, and a drive motor. The drive pulley has a drive shaft direction length less than a plurality of previously set belt widths of the endless belt and has the driving shaft direction length being set to a same length regardless of the plurality of previously set belt widths of the endless belt. Axial lengths of the first pulley and the second pulley are set to the same length as the axial lengths of the head pulley and the tail pulley. The support frame is rotatably attached to the first pulley and the second pulley. The drive motor hung from a lower surface of the support frame in order for the drive pulley to be positioned at an approximately center portion in a width direction of the endless belt.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANKI ENGINEERING CO LTD8-1 AKASHICHO CHUO-KU TOKYO 104-8506

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamaji, Yoshiteru Machida, JP 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00