Method and apparatus for improving the resolution of digitally sampled analog data
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Sep 26, 2017
Grant Date -
N/A
app pub date -
Jul 13, 2016
filing date -
Jul 13, 2016
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A system and method is described for converting an analog signal into a digital signal. The gain and offset of an ADC is dynamically adjusted so that the N-bits of input data are assigned to a narrower channel instead of the entire input range of the ADC. This provides greater resolution in the range of interest without generating longer digital data strings.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
THE BOEING COMPANY | 100 N RIVERSIDE CHICAGO IL 60606 |
International Classification(s)

- 2016 Application Filing Year
- H03M Class
- 1843 Applications Filed
- 1614 Patents Issued To-Date
- 87.58 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Liaghati, Amir L | Huntsville, US | 9 | 23 |
# of filed Patents : 9 Total Citations : 23 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- H03M Class
- 14.08 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Mar 26, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Mar 26, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
