Method of manufacturing fan out wafer level package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9773684
SERIAL NO

14927199

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a fan out wafer level package comprises: preparing conductive projections on an upper surface of a chip; mounting the chip on a carrier with the upper surface of the chip facing upwards; plastic packaging the chip to form a plastic packaging body with tops of the conductive projections being disposed outside the plastic package body; and implementing a redistribution line processing on the plastic package body. With this method, chips can be made small and thin and the manufacturing processes can be simplified.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL CENTER FOR ADVANCED PACKAGING CO LTD214028 BUILDING D1 CHINA SENSOR NETWORK INTERNATIONAL INNOVATION PARK NO 200 LINGHU AVENUE NEW DISTRICT WUXI CITY JIANGSU PROVINCE WUXI CITY JIANGSU PROVINCE 214028

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Feng Wuxi, CN 635 6497
Liu, Yibo Wuxi, CN 50 475
Shangguan, Dongkai Wuxi, CN 42 609
Sun, Peng Wuxi, CN 452 1010
Wang, Hongjie Wuxi, CN 32 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00