Systems and methods for controlling energy input into a building

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9772633
SERIAL NO

14470311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one aspect, a system for controlling each control volume of a plurality of control volumes is provided. The system includes a plurality of sensors corresponding to the plurality of control volumes, and each sensors is configured to detect a temperature value of the control volume corresponding to the sensor, and generate a feedback signal for the control volume corresponding to the sensor based on the temperature value. The system further includes a primary controller configured to receive a set point temperature value for each control volume, receive the feedback signal for each control volume, execute a linear quadratic regulator (LQR) control that is configured to determine a target set point temperature value for each control volume based on the set point temperature value for the control volume and the feedback signal for the control volume, and transmit the target set point temperature value for each control volume.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IPCREATE INC426 INDUSTRIAL AVE SUITE 150 WILLISTON VT 05495

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bouhal, Abderrahim Roscoe, US 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00