Fastening arrangement with tolerance compensation, and method for pre-assembly and assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9771962
APP PUB NO 20150139749A1
SERIAL NO

14390612

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a fastening arrangement for fastening a component A to a component B with automatic tolerance compensation between the components A and B. The fastening arrangement comprises a fixable base element into which a mounting screw can be screwed via a first thread pair, and an adjusting element with an external thread that can be screwed into the base element via a second thread pair, wherein a first and a second anti-rotation safeguard are provided between the base element and the adjusting element, wherein said anti-rotation safeguards can be used to prevent detachment of the adjusting element from the base element during transport as well as locking of the adjusting element with the base element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BÖLLHOFF VERBINDUNGSTECHNIK GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Figge, Hans-Ulrich Schloβ Holte-Stukenbrock, DE 19 226
Metten, Andreas Versmold, DE 6 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00