Method for producing barium titanate powder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9771274
SERIAL NO

15037250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a method for producing barium titanate powder comprising the steps of: adding an aqueous slurry of anatase hydrous titanium oxide having a BET specific surface area in the range of 200 m2/g to 400 m2/g and a half width of diffraction peak of (101) plane in the range of 2.3° to 5.0° as measured by X-ray diffraction to an aqueous solution of barium hydroxide while maintaining the aqueous solution of barium hydroxide at a temperature in the range from 80° C. to the boiling point thereof under normal pressure to cause a reaction of the barium hydroxide with the hydrous titanium oxide to provide an aqueous slurry of barium titanate precursor; and subjecting the barium titanate precursor thus obtained to hydrothermal treatment over a period of not less than 24 hours to provide barium titanate particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAKAI CHEMICAL INDUSTRY CO LTDSAKAI-SHI OSAKA 590-8502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baba, Yuji Sakai, JP 21 218
Kuniyoshi, Yukihiro Iwaki, JP 3 5
Ogama, Shinji Sakai, JP 4 13
Yamanaka, Kazumi Sakai, JP 4 2
Yoneda, Minoru Sakai, JP 17 145

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00