Method for producing a component from a fibre composite, preform therefor, and component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9770874
SERIAL NO

13806279

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a component from a fiber composite. A number of layers of a dry fibrous material are stacked to form a pile, the pile is covered by a thermoplastic film in a gas-tight manner, the inner space occupied by the pile within the film is pumped dry and the layers are fixed to form a preform that is stable during transport, the preform is reshaped, a liquid thermosetting material is inserted into the inner space by infiltration of the fibrous material, and the preform is hardened with the infiltrated fibrous material to form the finished component, the film binding permanently as the surface. The invention also relates to a component produced in such a way, and to a corresponding preform. The production method provides a process-integrated surface finishing of the fiber composite. The surface properties are created by the bound thermoplastic film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNISCHE UNIVERSITAET MUENCHENARCISSTRASSE 21 MUENCHEN 80333

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Häffelin, Daniel Munich, DE 2 4
Zaremba, Swen Munich, DE 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00