Arrangement and method for radio-frequency (RF) high power generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9768745
APP PUB NO 20160322945A1
SERIAL NO

15107719

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and arrangement for RF high power generation includes a power combiner having RF inputs and an RF output, and at least two power amplifier modules, respectively electrically connected by a transmission line to an input of the power combiner, wherein a directional coupler is electrically connected to the RF output of the power combiner and every transmission line includes an RF switch, where the Method includes measuring and determining values of the power amplifier modules, storing the values and applying the values as a correction to the input signal of the power amplifier modules.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OOO SIEMENSBOLSHAYA TATARSKAYA STREET 9 MOSCOW 115 184

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ivanov, Evgeny Moscow, RU 7 10
Krasnov, Andrey Moscow, RU 8 6
Nikolskiy, Konstantin Ivanteevka, RU 3 2
Polikhov, Stepan Ramenskoye, RU 10 18
Sharkov, Georgy Moscow, RU 2 1
Smirnov, Alexander Moscow, RU 20 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00