Motor with thrust bearing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9768651
SERIAL NO

14530870

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor includes a base, a bearing sleeve, a stator, a rotating member, a thrust bearing, and a hub. The bearing sleeve is arranged with the base and has an opening end and a sealing end opposite to each other. The stator connects with the base or the bearing sleeve. The rotating member is arranged inside the bearing sleeve and includes a shaft and a limiting portion adjacent to the sealing end. A first end of the shaft connects with the limiting portion, and a second end of the shaft has a coupling portion adjacent to the opening end. The thrust bearing is arranged between the shaft and an inner surface of the bearing sleeve, so that the limiting portion is between the thrust bearing and the sealing end. The hub connects with the coupling portion of the shaft and has a permanent magnet corresponding to the stator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNONWEALTH ELECTRIC MACHINE INDUSTRY CO LTDNO 30 LN 296 SINYA RD CIANJHEN DIST KAOHSIUNG CITY R O C

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horng, Alex Kaohsiung, TW 558 4176
Wang, Ko-Chien Kaohsiung, TW 7 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00