Single-phase electric motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9768649
SERIAL NO

14772381

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric motor (10) has a stator (20) having a number S of stator poles (21, 22, 23, 24, 25, 26); a rotor (40) having a rotor magnet (40′), which rotor magnet (40′) has a number R of rotor poles (41, 42, 43, 44, 45, 46), R being equal to S, and the rotor (40) or the stator (20), or both, exhibiting a magnetic asymmetry. The asymmetry facilitates startup. The electric motor has a single-phase winding arrangement (30) with first (11), second (12) and third (13) terminals. Current can be made to flow, selectively, from either the first or the second terminal, through certain coils, to the third terminal (13). There is an output stage (50), preferably an H-bridge. The W total coils comprise a plurality of subgroups (TG1, TG2) of coils. A method for current flow through an electric motor utilizes these sub-groups (TG1, TG2) for current flow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EBM-PAPST ST GEORGEN GMBH & CO KGHERMANN-PAPST-STRASSE 1 PATENT DEPT ST GEORGEN D-78112

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Karwath, Arno Deisslingen, DE 38 580
Winter, Bjoern St. Georgen, DE 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00