Receptacle connector with improved fastening and clamping components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9768535
SERIAL NO

15209726

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A receptacle connector includes an insulating housing, a plurality of terminals fastened to the insulating housing, a clamping element and two pairs of reinforcing blocks. A middle of a front surface of the insulating housing is recessed inward to form an insertion space. Two opposite sides of the insulating housing define two clamping grooves. The clamping element has a fixing board fastened to the insulating housing. Two opposite sides of the fixing board are bent frontward to form two clamping arms. Tail ends of the two clamping arms are connected with two clamping portions. The two pairs of reinforcing blocks are fastened in top walls and bottom walls of the two clamping grooves, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHENG UEI PRECISION INDUSTRY CO LTDNO 18 CHUNG SHAN ROAD TU-CHENG DISTRICT NEW TAIPEI CITY 236

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Kai-Hsiang New Taipei, TW 60 324
Wu, Yun Dong-Guan, CN 96 968
Ye, Chao-Yong Dong-Guan, CN 14 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00