TFT backplate structure comprising transistors having gate isolation layers of different thicknesses and manufacture method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9768202
APP PUB NO 20160247836A1
SERIAL NO

14426155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a TFT backplate structure and a manufacture method thereof. The TFT backplate structure comprises a switch TFT (T1) and a drive TFT (T2). The switch TFT (T1) is constructed by a first source/a first drain (61), a first gate (21), and a first etching stopper layer (51), a first oxide semiconductor layer (41), a first gate isolation layer (31) sandwiched in between. The drive TFT (T2) is constructed by a second source/a second drain (62), a second gate (22), and a second oxide semiconductor layer (42), a first etching stopper layer (51), a second gate isolation layer (32) sandwiched in between. The electrical properties of the switch TFT (T1) and the drive TFT (T2) are different. The switch TFT has smaller subthreshold swing to achieve fast charge and discharge, and the drive TFT has relatively larger subthreshold swing for controlling the current and the grey scale more precisely.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHENZHEN CHINA STAR OPTOELECTRONICS TECHNOLOGY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lv, Xiaowen Guangdong, CN 81 163
Su, Chihyu Guangdong, CN 27 103
Tseng, Chihyuan Guangdong, CN 38 103
Zhang, Hejing Guangdong, CN 40 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00