Constant current source circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9766646
SERIAL NO

14875388

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One current source includes a first transistor including a drain connected to an output terminal, and a source directly connected to a first power supply, a second transistor including a drain connected to a gate, the gate of the second transistor being connected to the gate of the first transistor, and a source directly connected to the first power supply, a third transistor opposite the first channel type including a drain connected to the drain of the second transistor, a fourth transistor including a drain connected to the source of the third transistor, a gate connected to a first bias voltage, and a source directly connected to second power supply voltage, and a control voltage generator that detects an output voltage on the output terminal and provides a shifted version of the output voltage to the gate of the third transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LONGITUDE LICENSING LIMITEDBRACKEN ROAD SANDYFORD FIRST FLOOR BLACKTHORN EXCHANGE DUBLIN D18 P3Y9

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ide, Akira Tokyo, JP 72 773

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00