Current sampling circuit and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9766274
SERIAL NO

14773758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a current sampling circuit including a proportional current output circuit and a full differential common mode negative feedback circuit, specifically the proportional current output circuit is configured to calculate a current output from a power device according to a preset proportion to obtain a first proportional current and a second proportional current, and to output the first proportional current and the second proportional current to the full differential common mode negative feedback circuit; and the full differential common mode negative feedback circuit is configured to shunt respectively the first proportional current and the second proportional current using a full differential common mode negative feedback network with a bias current in microamps to obtain a first sampling current and a second sampling current, and to output constantly the first sampling current and the second sampling current. Further disclosed is a current sampling method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANECHIPS TECHNOLOGY CO LTDSHENZHEN GUANGDONG 518055

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Jie Shenzhen, CN 208 643
Song, Xiaozhen Shenzhen, CN 1 1
Zhang, Yongbo Shenzhen, CN 16 161

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00