Precast reinforced concrete construction elements with pre-stressing connectors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9765521
SERIAL NO

15297093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The precast reinforced concrete construction elements with pre-stressing connectors provide beam-column connections which are post-tensioned through a combination of active and passive pre-stressing tendons. The active pre-stressing tendons improve the efficiency and effectiveness of the beam-column connections under service loads, as well as during application of external forces and stresses, such as during earthquakes. The passive pre-stressing tendons are lightly pre-stressed and only become effective during progressive collapse of the building. Specifically, the passive pre-stressing tendons become stressed only during downward movement of a joint due to the loss/damage of a column, thus providing resistance against further downward movement of the joint and thereby resisting the progressive collapse.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING SAUD UNIVERSITYPO BOX 800 RIYADH 11421

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abbas, Husain Riyadh, SA 25 89
Al-Salloum, Yousef A Riyadh, SA 25 89
Almusallam, Tarek H Riyadh, SA 23 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00