Factory building assembly structure and method for assembling factory building using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9765511
SERIAL NO

12937629

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A framing member forming a frame of a factory building is provided with a slit for attaching a holder on one side face of the framing member, the slit extending in a longitudinal direction of the framing member, the slit is provided with a detachment prevention mechanism configured to exert an action of preventing an insertion piece of the holder from being detached and to fix the holder to the framing member, along with an insertion of the insertion piece into the slit, and the holder is provided with a pinching piece configured to pinch an end edge portion of a wall panel between the pinching piece and the framing member to fix the wall panel to the framing member, along with the insertion of the insertion piece into the slit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIKISHA LTD17-1 NISHISHINJUKU 8-CHOME SHINJUKU-KU TOKYO 1606129 ?1606129

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Tadashi Kawasaki, JP 124 941
Nakajima, Hisao Kitakyushu, JP 23 149

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00