Top comb fastening for a textile combing machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9765452
APP PUB NO 20150252495A1
SERIAL NO

14431942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A top comb for a combing machine, comprising a top comb carrier which has a retaining section that is connected to a carrier plate to which a needle strip or a top comb clothing is fastened, the top comb carrier in the area of its retaining section being fixable to a top comb retainer by means of at least one retaining bracket that is associated with the top comb retainer. In order to minimize the wear between the top comb carrier and a retaining bracket that is hinged to a top comb retainer, it is proposed that at least two additional retaining elements are mounted on the retaining section of the top comb and can be encompassed by one retaining bracket in each case, the retaining means, at least in the area that can be encompassed by the respective retaining bracket, being made of a material that is harder than the retaining section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MASCHINENFABRIK RIETER AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cavadini, Flavio Winterthur, CH 2 2
Meyer, Nikolaus Winterthur, CH 3 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00