Process for reducing the production of sludge by municipal or industrial wastewater purification plants, and equipment for the implementation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9764976
APP PUB NO 20150210577A1
SERIAL NO

14417219

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for reducing the production of sludge by municipal or industrial wastewater purification plants, comprising a step of mesophilic or thermophilic anaerobic digestion (20), or anaerobic digestion combining these two operating modes, of a stream of sludge to be treated (1), and at least one biological solubilization anaerobic treatment step (30); the process comprises, upstream of the anaerobic digestion step, a step of dehydration (10) of the sludge to be treated, followed by a step of mixing (15) the dehydrated sludge with a recirculated fraction of sludge that is more liquid, originating from recycling of the digestion (20), and/or from the anaerobic treatment step (30), and/or centrates originating from a final dehydration (50) of the treated sludge, wherein the recirculation rate is chosen such that the mixture has a dryness suitable for digestion, this mixture then being directed towards the digestion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEGREMONT183 AVENUE DU 18 JUIN 1940 92508 RUEIL MALMAISON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pardo, Pierre-Emmanuel Orsay, FR 8 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00