Magnesium-based hydrogen storage material and method for preparing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9764951
SERIAL NO

14917142

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for preparing a magnesium-based hydrogen storage material, includes: a Mg—Ce—Ni family amorphous alloy is prepared by a rapid cooling process; the amorphous alloy is pulverized, so as to obtain a amorphous powder; the amorphous alloy is activated, so as to obtain a MgH2—Mg2NiH4—CeH2.73 family nanocrystalline composite; the abovementioned composite is carried out a hydrogen absorption and desorption cycle, then the composite is placed in a pure Ar atmosphere for passivation, finally, the passivated composite is oxidized, so as to obtain a MgH2—Mg2NiH4—CeH2.73—CeO2 family nanocrystalline composite.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOUTH CHINA UNIVERSITY OF TECHNOLOGY510641 NO FIVE 381 MOUNTAIN ROAD GUANGZHOU GUANGDONG TIANHE DISTRICT GUANGZHOU CITY GUANGDONG PROVINCE 510641

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Huaijun Guangzhou, CN 1 0
Liu, Jiangwen Guangzhou, CN 4 0
Ouyang, Liuzhang Guangzhou, CN 7 2
Wang, Hui Guangzhou, CN 1115 8921
Wang, Weihua Guangzhou, CN 48 314
Zhao, Deqian Guangzhou, CN 2 0
Zhu, Min Guangzhou, CN 244 15096

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00