Anodic oxide film structure cutting method and unit anodic oxide film structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9764949
SERIAL NO

15259478

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An anodic oxide film structure cutting method is provided. The method includes: an etching step of forming an etched groove by etching one surface of an anodic oxide film having a plurality of anodizing pores along a predetermined cutting line and forming increased-diameter pores by enlarging entrances of the anodizing pores positioned on an inner bottom surface of the etched groove; and a cutting step of cutting the anodic oxide film along the etched groove. Also provided is a unit anodic oxide film structure produced by the cutting method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POINT ENGINEERING CO LTD89 ASANVALLEY-RO DUNPO-MYEON ASAN-SI CHUNGCHEONGNAM-DO 31409

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Bum Mo Suwon-si, KR 162 241
Byun, Sung Hyun Hwaseong, KR 78 102
Park, Seung Ho Hwaseong-si, KR 185 355

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00