Process and plant for refining raw materials containing organic constituents

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9764300
SERIAL NO

14564183

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plant for refining raw materials containing organic constituents includes a reactor configured to receive raw materials; a furnace configured to receive solids and fuel from the reactor; a return conduit configured to recirculate hot solids generated in the furnace to the reactor; and a sealing device configured to separate an oxidizing atmosphere of the furnace from an atmosphere of the reactor. The sealing device includes: a downpipe disposed between the furnace and the reactor, the downpipe being configured to withdraw a stream of solids from the furnace; a rising pipe disposed near a bottom of the downpipe and branching off there from to a top, the rising pipe being configured to transport a fluidized stream of solids to the reactor; and a conveying gas supply disposed below the rising pipe, the conveying gas supply being configured to fluidize a stream of solids withdrawn from the furnace.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OUTOTEC OYJ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anastasijevic, Nikola Altenstadt, DE 26 87
Missalla, Michael Oberursel, DE 16 65
Orth, Andreas Friedrichsdorf, DE 32 190
Schneider, Guenter Lorsch, DE 17 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00