Data storage communication apparatus, and data transmission and management methods using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9762696
SERIAL NO

13484971

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are a data storage communication apparatus, and data transmission and management methods using the same. The data storage communication apparatus includes a data request signal reception unit, a main control unit, massive storage, and a data transmission unit. The data request signal reception unit receives a data request signal from one of a plurality of user terminals. The main control unit analyzes the data request signal received by the data request signal reception unit, and determines whether data is present in the apparatus itself by searching the apparatus. The massive storage stores and manages a variety of types of data found by the main control unit. The data transmission unit transmits the data to the user terminal. The data is found in the storage by the main control unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUTE FOR BASIC SCIENCEDAEJEON 34047

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Sangsu Jinhae-si, KR 22 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00