Electric power distribution system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9762036
SERIAL NO

15121189

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric power distributor comprises a distributor housing, conversion parts which convert electric current from outside of the distributor housing to low-voltage alternating current, a transformer which transforms the low-voltage alternating current from the conversion parts to high-voltage alternating current and a power transmission part which transmits the high-voltage alternating current from the transformer to the outward distributor housing. The distributor housing comprises two conversion parts—and the power transmission part—inside. The transformer is attached to the distributor housing from outside. The transformer and the power transmission part are placed along a predetermined direction in this order, the two conversion parts are placed along a direction approximately orthogonal to the predetermined direction at an opposite side to the transformer with regards to the power transmission part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WAVE ENERGY INCTOKYO 105-0014

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honke, Masao Mitoyo, JP 2 3
Ishimoto, Mitsutake Mitoyo, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00