Self-aligned trench MOSFET and method of manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9761696
SERIAL NO

14221012

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A trench metal-oxide-semiconductor field effect transistor (MOSFET), in accordance with one embodiment, includes a drain region, a plurality of gate regions disposed above the drain region, a plurality of gate insulator regions each disposed about a periphery of a respective one of the plurality of gate regions, a plurality of source regions disposed in recessed mesas between the plurality of gate insulator regions, a plurality of body regions disposed in recessed mesas between the plurality of gate insulator regions and between the plurality of source regions and the drain region. The MOSFET also includes a plurality of body contact regions disposed in the each body region adjacent the plurality of source regions, a plurality of source/body contact spacers disposed between the plurality of gate insulator regions above the recessed mesas, a source/body contact disposed above the source/body contact spacers, and a plurality of source/body contact, plugs disposed between the source/body contact spacers and coupling the source/body contact to the plurality of body contact regions and the plurality of source regions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VISHAY-SILICONIX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Kuo-In Los Altos, US 33 636
Li, Jian Palo Alto, US 590 16324
Terril, Kyle Santa Clara, US 2 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00