Power MOSFET and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9761464
SERIAL NO

14727872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power MOSFET includes a substrate, a dielectric layer, solder balls, first and second patterned-metal layers. The substrate includes an active surface, a back surface, a source region and a gate region on the active surface, and a drain region on the back surface. The first patterned-metal layer disposed on the active surface includes a source electrode, a gate electrode, a drain electrode and a connecting trace. The source and gate electrodes electrically connect the source and gate regions. The connecting trace located at an edge of the substrate electrically connects the drain electrode. The dielectric layer disposed on the active surface exposes the first patterned-metal layer. The second patterned-metal layer includes UBM layers covering the source, gate and drain electrodes and a connecting metal layer covering the connecting trace and extending to the edge to electrically connect the drain region. The solder balls are disposed on the UBM layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXCELLIANCE MOS CORPORATION4F -1 NO 22 TAIYUAN ST ZHUBEI CITY HSINCHU COUNTY 302

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Yi-Chi Hsinchu County, TW 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00