Circuit and method for three-phase detection, and compressor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759756
SERIAL NO

14967534

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit for three-phase detection, a method for three-phase detection and a compressor are provided. The circuit for three-phase detection includes a first optical coupler and a second optical coupler. A first input end and a second input end of the first optical coupler are respectively connected to a first phase wire and a third phase wire of a power supply assembly, and a first output end of the first optical coupler provides a first output signal. A first input end and a second input end of the second optical coupler are respectively connected to a second phase wire and the third phase wire of the power supply assembly, and a first output end of the second optical coupler provides a second output signal. The first output signal and the second output signal are used to indicate a phase state of a three-phase alternating current of the power supply assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DANFOSS TIANJIN LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Jingyuan Tianjin, CN 14 18
Ma, Zhenqiang Tianjin, CN 63 734
Zeng, Huapeng Tianjin, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00